Extensive fire damage occurred to the 1st floor living accommodation to the Cross Keys Public House, with minor smoke damage to the trading areas.
The rear 1st floor accommodation was partially demolished and rebuilt reforming two bedrooms and passageway. The kitchen and bathroom were reinstated, damage walls and plasterwork were replaced to the 1st floor. New doors, frames and skirtings were fitted, complete with new insulation, flooring and decoration.
All works were carried out within a six week contract period and completed within the time frame.
To view case studies, please visit the following pages:

Rear elevation showing working compound with storage unit and facilities. Full Health & Safety Construction Plan was provided.










One of the bedroom pre-
Bedroom re-
Showing one of the bedrooms on completion
Bathroom pre-
Bathroom completion
Rear 1st floor bedroom block pre-
Rebuilding of timber frame construction
Rear 1st floor bedroom block completion
Kitchen pre-
Kitchen completion
Please scroll down to see the refurbishment works at Cross Keys.